1
$\begingroup$

I was given a directed acyclic graph $G=(V,E)$ that has red and blue edges, and I want to generate a path from vertex $s$ to vertex $t$ such that the path has a maximum number of red edges.

After thinking about this I've decided to let every blue edge have a cost $0$ and every red edge to have a cost of $1$, which I think is the same problem.

I'm trying to use dynamic programming to generate this path but I'm confused on how to approach this to run this in linear time.

$\endgroup$
1
$\begingroup$

If the vertices are already in topological order (that is, all edges go from left to right) then you can start at $s$ and go in order. For each vertex, compute the maximum cost path from $s$ to that vertex, by considering all the edges that point into that vertex.

This takes $O(|V|+|E|)$ time.

If the vertices are not already sorted this way, then you should look at one of these algorithms for fixing that. These also take $O(|V|+|E|)$ time.

In general, this is nearly always the setup for dynamic programming in a directed acyclic graph, just because the topological sort is the primary way we can take advantage of the lack of cycles.

$\endgroup$
  • $\begingroup$ Yes now I need to to write the formula to fill my path array(result) $\endgroup$ – user3133165 Jan 26 at 16:49