Suppose I have M/M/1 system with $\lambda = 4$ per hour and $\mu = 5$ per hour. How can I find out if all jobs have been served after, say, 8 hours? At first I thought about doing $P(n > 40)$ since $\mu = 5$ means 5 arrive, on average, per hour but I'm pretty sure that's not the right way to do it. I don't know how it actually goes, however.
Tell me more
×
Mathematics Stack Exchange is a question and answer site for
people studying math at any level and professionals in related fields. It's 100% free, no registration required.
|
|
What is the probability that the queue is empty? |
|||||||
|